The Toyota Way Essay, Research Paper To address the seat problem, we would focus on finding out why there are so many defects in seat installation and production. Is it because of the supplier of the part? Or are the problems due to Toyota? Doug should also determine whether the process of installing and manufacturing the seats is allowing Toyota to efficiently identify the cause of problems and breakdowns. As the Toyota plant Manager we would focus our attention on the following areas: a) We will investigate the engineering change from metal to plastic. Although the hook breakage frequency went down in April, the process should be monitored further to determine if it contributes to the frequency of defects in the seat installation station. b) Doug should work with the

supplier Kentucky Framed Seat (KFS) to reduce supplier defects and errors. Because the frequency of defects has increased, TMC is often forced to hold more cars in finished goods inventory. There should be a concerted effort to improve the readiness of KFS in the change over process. This can be done by further reengineering of the KFS plant to make them more efficient in dealing with the changeover to a new model over a very short period. In addition, TMC alongside KFS should institute a worker training program for the new models. To further reduce the defects from KFS, TMC should work with its planning department to give KFS more lead-time in preparing their plant for the new models. c) Because the seat defects are a problem in the line, we recommend TMC build a safety

inventory of seats. By doing this, the cars will not be pushed through the line. Having a safety inventory of seats will make it more realistic for the plant to implement a Kanaban system. d) Doug should determine if the plant can distinguish between defects from TMC and KFS. If this is possible, the TMC should institute a work in process inventory cap (WIP) or Kanaban system on the seat installation station. Although this will make the plant more vulnerable to operational problems, it would allow problems to be exposed quicker and it would place pressure on the plan to fix the operational problems in the plant. In applying the Kanaban system, due to the high number of defects we would apply a high Kanaban count to the seat installation station. e) In addition Doug Friesen should

ask KFS to increase the number of times it delivers replacement seats to the plant. This can be done by not waiting to batch the orders into two major trips a day. KFS could include a replacement part on each of their delivery trips every hour and half. This change in delivery of replacement parts will will reduce the cycle time and the idle bottleneck in the plant. Two Stopping the line increases the vulnerability of the plant to manufacturing and operational problems. Although costly, it serves a purpose of identifying problems early and addressing them immediately, and assigning responsibility to the work station. The cost of pulling a chord can be based on wages for the hourly employees. Of the 769 hourly employees, approximately 75% or 577 are regular workers and the

remaining 25% or a72 are team leaders. Assumptions: 577 regular employees @$17/hour = $.283/minute 172 team leaders @$18/hour =$.30/hour Work stoppage calculation Regular employee per minute cost: ($.283*1*577)*150% =$163.45 Teal leaders per minute cost: ($.30/1*172)*150% = $77.40 Cost of work stoppage/minute: $240.85 Cost of work stoppgae/30 minutes: $7,225 Cost of work stoppage/60 minutes: $14,451 The calculation assumes no extra cost for parts, management wags and benefits. 2b) If TMC can distinguish whether the defect is from their plant or KFS’, then it would be advisable to stop the line. However, if the defective parts are overwhelmingly form the supplier, stopping the line without immediate replacements from the supplier or from safety inventory would be too costly.